MILAH, S. ANALISIS PENGENDALIAN WAKTU PROYEK KONTRUKSI MENGGUNAKAN EARNED VALUE CONCEPT (EVC) DAN CRITICAL PATH METHOD (CPM) (Studi Kasus : Lanjutan Pembangunan Jalan Ruas Jalan Ciawi Singaparna Kabupaten Tasikmalaya). JITSi : Jurnal Ilmiah Teknik Sipil, [S. l.], v. 1, n. 1, p. 1–14, 2020. DOI: 10.36423/jitsi.v1i1.478. Disponível em: https://e-journal.unper.ac.id/index.php/JITSi/article/view/478. Acesso em: 26 apr. 2024.