ANALISIS RESIKO PROYEK PADA PEKERJAAN JEMBATAN CISEPET CIKATOMAS DENGAN METODE FMEA
DOI:
https://doi.org/10.36423/jitsi.v4i1.1585Keywords:
Analysis risk, Failure Mode and Effect Analysis (FMEA)Abstract
Bridge construction involves uncertain risks, therefore it is necessary to carry out an analysis of all the risks that will occur, how big their impact will be (intensity), and the possibility of these risk events occurring. The method used is the Failure Mode and Effect Analysis (FMEA) method by determining severity, occurrence, detection where the results become RPN values and are determined by looking at the risk matrix table. From the risk matrix table above, conclusions can be drawn for high risk, namely the condition of the road to the project is steep, the project environment is less clean, the groundwater level is higher than the river, heavy equipment accidents, workers not wearing PPE, worker negligence and human resources not concentrating. For low risks, namely heavy equipment accidents, workers not wearing PPE and soft ground conditions. The results of the analysis using the FMEA method produced an RPN value of 64.00, it was found that 3 risk lists were included in the serious risk category and the highest risk value (NR) was 16, which was included in the high risk rating and required action to be taken.
Keywords — Analysis, risk, project, Failure Mode and Effect Analysis (FMEA)
Abstrak—Konstruksi jembatan melibatkan risiko yang tidak pasti, oleh karena itu perlu untuk menganalisis semua risiko yang akan terjadi serta tingkat dampak dan kemungkinan risiko peristiwa. Metode yang digunakan dalam penelitian ini adalah Metode Failure Mode and Effect Analysis (FMEA) dengan menentukan tingkat keparahan, peristiwa, deteksi dimana hasilnya adalah nilai RPN dan ditentukan dengan melihat tabel matrik risiko. Hasil analisis menggunakan metode FMEA menghasilkan RPN nilai 64,00, ditemukan 3 daftar resiko yang jatuh ke kategori resiko serius dan nilai risiko tertinggi (NR) adalah 16 yang termasuk dalam peringkat risiko tinggi dan perlu ditangani.
Kata kunci — Analisis, risiko, Failure Mode and Effect Analysis (FMEA)
References
Aan Syuryadi, P. (2016). Analisis Risiko Pada Uji Pembebanan (Loading Test) Jembatan Dengan Menggunakan Metode Failure Mode and Effect Analysis (Fmea). Teknik Sipil, 218–226.
Alfiyah, C. Q., Asih, A. Y. P., Afridah, W., & Fasya, A. H. Z. (2023). Analisis Risiko Kecelakaan Kerja Dengan Metode Failure Mode and Effect Analysis Pada Pekerja Proyek Kontruksi: Literature Review. Jurnal Ilmu Psikologi Dan Kesehatan, 1(4), 283–290.
Aziz, U. A., & Muhammaad, A. (2020). Analisis Perbandingan Resiko Biaya Kontrak Lumpsum dan Unit Price pada Proyek Konstruksi di Kabupaten Purworejo Menggunakan Metode Decision Tree. Prosiding University Research Colloquium, 0(0 SE-Articles), 1–12. http://repository.urecol.org/index.php/proceeding/article/view/1095
Gita, M. A. (2015). Analisa Risiko Kecelakaan Kerja Proyek Marvell City Linden Tower Surabaya Menggunakan Metode FMEA (Failure Mode And Effect Analysis) Dan FTA (Fault Tree Analysis). 115. http://repository.its.ac.id/71199/
Mahmuddin, A. (2020). Identifikasi Risiko Pada Proyek Pembangunan Penggantian Jembatan Rangka Baja Di Aceh Jaya Dan Aceh Besar. Journal of The Civil Engineering Student, 2(3), 211–217. http://www.jim.unsyiah.ac.id/CES/article/view/10700
Penangsang, Y. T. P., & Basuki, M. (2024). Mitigasi Risiko Operasional Pembangunan Kapal Baru di Galangan Kapal Surabaya Menggunakan Metode FMEA (Failure Mode and Effect Analysis) dan BTA (Bowtie Analysis). Seminar Nasional Teknologi Industri Berkelanjutan IV, Senastitan IV, 1–8.
Tumimomor, J. E. E., Manalip, H., & Mandagi, R. J. . (2014). Analisis resiko pada konstruksi jembatan di sulawesi utara. Jurusan Arsitektur, 6(2), 235–241.
Downloads
Published
How to Cite
Issue
Section
License
Naskah yang diserahkan oleh penulis diserahkan pada juri (Reviewer) melalui tim editor secara anonim, serta hasil penilaian yang diberikan oleh juri (Review) untuk penulis dikembalikan secara anonim.